Safety Management System (SMS)

Stop managing safety in a separate system

Cirro SMS is a fully integrated Safety Management System built directly into your core operations platform—not a standalone app with extra logins or disconnected workflows.

FREE SMS for 12 months

Cirro SMS also available as a standalone module

Risk Assessment screenshot

SMS Compliance: Get Ready for the FAA SMS Mandate

Instead of managing safety through a separate app, spreadsheets, forms, or disconnected workflows, Cirro brings safety and operational information together within one platform.

For helicopter, fixed-wing, and mixed-fleet operators, Cirro helps organizations identify hazards, assess risk, manage corrective actions, monitor safety performance, and maintain audit-ready records, ultimately providing a practical way to implement and manage SMS.

Why Operators Choose Cirro SMS

  • Increase reporting participation across your organization
  • Capture safety reports from employees, contractors, passengers, and external stakeholders
  • Identify trends before they become incidents
  • Reduce administrative workload through automation
  • Maintain complete visibility of corrective actions and risk mitigations
  • Demonstrate regulatory compliance with confidence
  • Scale from a single-base operator to a multi-location enterprise operation
  • Access all safety information from a single integrated platform

Cirro’s fully integrated SMS is designed to support FAA Part 5 SMS requirements while connecting safety directly with everyday flight operations. The FAA has expanded SMS requirements, with a compliance deadline of May 28, 2027.

Preparing for the FAA SMS mandate involves more than developing policies or completing documentation. An effective SMS needs to become part of how an operator identifies hazards, evaluates risk, makes operational decisions, measures safety performance, and communicates safety information throughout the organization.

“Ops and safety in one package was the deciding factor for us.”

PJ Helicopters

Risk Assessment screenshot

Does Your Operation Fall Under the FAA Mandate?

The FAA’s SMS Final Rule expands Part 5 requirements to include:

  • Part 121 Certificate Holders (Already mandated since 2015)
  • Part 135 Operators (Charter & air ambulance)
  • Part 91.147 Operators (Passenger-carrying commercial air tours)
  • Part 21 Manufacturers (Certain holders of type and production certificates)

Whether you’re implementing an FAA SMS for the first time, moving away from spreadsheets and paper processes, or replacing standalone safety software, Cirro provides a scalable FAA SMS solution that integrates safety with your broader aviation operation. 

Key Cirro SMS Features

Manage your entire safety workflow from initial reporting through investigation, corrective actions, risk management, and continuous performance monitoring, all within a single integrated platform.

  • Hazard, occurrence, and safety event reporting
  • Online and offline reporting from the field
  • Works on desktop, tablet, and mobile devices
  • Unlimited users on our most popular plans
  • Internal and external reporting through QR codes and secure web links
  • Anonymous reporting options
  • Safety Risk Management (SRM)
  • Management of Change (MOC) workflows for operational changes, risk assessments, action management, approvals, and effectiveness verification
  • Quality Assurance (QA) and internal auditing workflows for compliance monitoring, operational oversight, and continuous improvement
Edit Risk Matrix screenshot
  • Internal audit findings management, including corrective action tracking, supporting evidence, follow-up verification, and closeout
  • Configurable risk assessments and workflows
  • Customizable risk matrices and risk scoring methodologies
  • Root cause analysis and investigation tools
Corrective Actions screenshot
  • Corrective and preventive action (CAPA) management
  • Risk mitigation planning and tracking
  • Action assignment, accountability, and due date management
  • Automated notifications, reminders, and escalation workflows
  • Safety performance indicators (SPIs) and targets
Safety Report Dashboard screenshot
  • Real-time dashboards and safety analytics
  • Automated trend monitoring and emerging risk identification
  • Safety trend analysis across departments, locations, aircraft, and operations
  • Findings tracking and continuous improvement monitoring
  • Controlled safety policies, manuals, and documentation
  • Complete report, investigation, and action traceability
  • Audit-ready records and regulatory reporting support
  • ICAO, FAA, EASA and Transport Canada SMS aligned processes
  • Company-wide safety communication and feedback tools
  • Integrated with flight operations, personnel, training, and document management modules
  • Secure cloud-based platform with configurable access controls
  • Historical safety data retention and searchable records
  • Executive-level safety performance reporting
MOC Module screenshot
Safety Report Dashboard screenshot

The Four Pillars of an Aviation SMS

Cirro supports the four internationally recognized pillars of Safety Management Systems, providing an integrated framework to help aviation operators proactively manage risk, maintain regulatory compliance, and continuously improve safety performance.

1. Safety Policy

Establish the foundation for your SMS with clearly defined safety policies, responsibilities, procedures, and accountability. Cirro centralizes safety policies, manuals, objectives, and documentation with controlled access and distribution, helping operators maintain consistent standards, communicate expectations, and ensure important safety information is readily available to crews and operational personnel.

2. Safety Risk Management

Cirro provides a structured approach to Safety Risk Management (SRM), enabling operators to identify hazards, assess risks using customizable risk matrices, conduct root cause investigations, and implement mitigation measures. Integrated Management of Change (MOC) workflows allow organizations to proactively evaluate changes to aircraft, personnel, procedures, equipment, and operations, with risk assessments, approvals, corrective actions, and effectiveness verification. By connecting safety directly with operational information, Cirro helps operators identify and manage risks before they result in incidents.

3. Safety Assurance

Ensure safety processes and risk controls remain effective through continuous monitoring, Quality Assurance (QA), and internal auditing. Cirro supports compliance monitoring, audit findings, corrective action management, and follow-up verification, helping organizations identify deficiencies and drive continuous improvement. Real-time dashboards, safety performance indicators, automated trend monitoring, and comprehensive reporting provide management with visibility into safety performance. Centralized records and complete action traceability support regulatory oversight and audit readiness.

4. Safety Promotion

Build a stronger safety culture through accessible reporting, effective communication, and employee engagement. Cirro makes safety reporting available across desktop, tablet, and mobile devices, with online and offline capabilities that allow personnel to participate wherever they operate. Company-wide safety communications, shared documentation, and feedback tools help organizations promote safety awareness, communicate lessons learned, and encourage proactive participation in their SMS.

Corrective Action Performance screenshot

Why Integrate SMS With Flight Operations?

Many traditional safety programs operate separately from the operations systems crews use daily.

Cirro takes a different approach. SMS is built into the Cirro aviation operations platform, meaning safety data is pulled directly from operational tools such as flight scheduling, crew management, and flight reporting, allowing safety information to become part of the operational workflow.

This can reduce duplicate entry while providing safety managers with better operational context around hazards, occurrences, and risk.

Move From Reactive Reporting to Proactive Safety Management

An effective Safety Management System should do more than document what has already happened.

Centralized reporting and safety performance information can reveal patterns that may be difficult to identify when reports are spread across separate spreadsheets, documents, and separate apps.

The goal is to move from simply recording hazards and occurrences toward identifying emerging risks and addressing them earlier.

Connecting Safety Beyond the Aircraft with Ground Crew Management

Safety doesn’t stop when the aircraft lands.

Cirro is developing a new Ground Crew Management module designed to better connect flight and ground operations within the Cirro ecosystem.The module is being developed for the realities of remote, utility and high-risk aviation operations, where pilots, ground crews, vehicles, equipment and operational teams need to work together.

Planned capabilities include ground crew coordination, fleet and asset management, operational reporting and workflows supporting activities such as fueling, staging and other ground operations. Bringing ground activities into the same ecosystem as flight operations and SMS will help operators build a more connected view of operational safety, from the cockpit to the ground crew.

Supporting Canadian Operations

For those flying on both sides of the border and beyond, while Cirro is well positioned for U.S. operators preparing for FAA Part 5 SMS requirements, the platform is also designed around internationally recognized aviation safety frameworks, including ICAO Annex 19 and Transport Canada requirements. For operators with Canadian operations or cross-border fleets, Cirro provides the advantage of managing safety and operations within the same scalable platform.

One SMS Connected to Your Operation

Safety management should strengthen your operation, not create another administrative burden.

Cirro combines safety reporting, risk management, corrective actions, operational information, and regulatory documentation within one aviation operations platform.

Now is the time to put the systems and processes in place to support an effective SMS. Get ahead of the U.S. FAA SMS mandate, FAA Part 5 requirements and the May 28, 2027 compliance deadline.

Ready for the FAA SMS mandate?

Talk to the AirSuite team about FAA Part 5 SMS compliance, and discover how Cirro can bring safety and operations together in one platform.
Edit Risk Matrix screenshot
Corrective Actions screenshot

The Four Pillars of an Aviation SMS

Cirro supports the four internationally recognized pillars of Safety Management Systems, providing an integrated framework to help aviation operators proactively manage risk, maintain regulatory compliance, and continuously improve safety performance.

1. Safety Policy

Establish the foundation for your SMS with clearly defined safety policies, responsibilities, procedures, and accountability. Cirro centralizes safety policies, manuals, objectives, and documentation with controlled access and distribution, helping operators maintain consistent standards, communicate expectations, and ensure important safety information is readily available to crews and operational personnel.

2. Safety Risk Management

Cirro provides a structured approach to Safety Risk Management (SRM), enabling operators to identify hazards, assess risks using customizable risk matrices, conduct root cause investigations, and implement mitigation measures. Integrated Management of Change (MOC) workflows allow organizations to proactively evaluate changes to aircraft, personnel, procedures, equipment, and operations, with risk assessments, approvals, corrective actions, and effectiveness verification. By connecting safety directly with operational information, Cirro helps operators identify and manage risks before they result in incidents.

3. Safety Assurance

Ensure safety processes and risk controls remain effective through continuous monitoring, Quality Assurance (QA), and internal auditing. Cirro supports compliance monitoring, audit findings, corrective action management, and follow-up verification, helping organizations identify deficiencies and drive continuous improvement. Real-time dashboards, safety performance indicators, automated trend monitoring, and comprehensive reporting provide management with visibility into safety performance. Centralized records and complete action traceability support regulatory oversight and audit readiness.

4. Safety Promotion

Build a stronger safety culture through accessible reporting, effective communication, and employee engagement. Cirro makes safety reporting available across desktop, tablet, and mobile devices, with online and offline capabilities that allow personnel to participate wherever they operate. Company-wide safety communications, shared documentation, and feedback tools help organizations promote safety awareness, communicate lessons learned, and encourage proactive participation in their SMS.

MOC Module screenshot
Corrective Action Performance screenshot

Get the FREE Two-Page SMS Guide Here

The Insider’s Guide to Setting Up a Safety Management System (SMS). Built by Dr. Kodey Bogart, AvD, a U.S.-Based SMS subject matter expert in partnership with AirSuite.

Get Your Free SMS Guide

    Explore all features

    Flight Following

    Flight Duty Times

    Weight and Balance

    Maps and Charts

    Safety Management System (SMS)

    Flight Reports

    Company Library

    Field Gear Tracking

    Scheduler

    Passenger Manifesting

    Dangerous Goods

    Quoting

    Invoicing

    Admin Tools and Reports

    Clients and Jobs

    Vehicle Reports